BackgroundPrevious StudiesMTO completed a Preliminary Design Study for the currently planned Highway 5 and Highway 6 interchange, including the submission of a Transportation Environmental Study Report (TESR) in 2003, and obtained the appropriate environmental approvals at that time. The 2003 study examined the provision of a new interchange to replace the existing Highway 5 and Highway 6 intersection in order to accommodate future traffic demand. A Preliminary Design Report was completed in 2004 to document the planning process at a more technical level and to provide a basis for the detail design process to follow. |